Some common sense of homogenizer, automatic homogenizer manufacturers for you

Time:2022-05-30 16:38


  Automatic HomogenizerThe manufacturer believes that the installation points of the homogenizer are as follows: place the high-pressure homogenizer on a flat and firm desktop, and then install the high-pressure pump, homogenizing valve, pressure gauge, one-way valve, sample tank and other components one by one (each component is relatively independent and can be disassembled separately). At the same time, prepare air compressor or nitrogen tank and circulating cooling water. An air compressor or nitrogen tank is used to provide the pressure required by the dynamic homogenization valve (5-10bar) and the pressure during pipeline flushing. Sample refrigeration uses circulating cooling water as a cold source, which can ensure that the sample remains low during the homogenization process and avoid sample denaturation and inactivation.

  

全自动均质机

Fully automatic homogenizer manufacturers believe that before starting the machine, check the entire sample path to ensure that the pipeline is clean. Disassemble all components in the entire sample path, first rinse with pure water, then rinse with 0.5M NaOH for a short time, and then rinse with warm water. After cleaning, the parts can be sterilized by hot steam, or the pipeline can be sterilized by hot steam circulation for about 10 minutes after installation.

  Automatic HomogenizerThe manufacturer believes that before starting the homogenizer, check the homogenized liquid to ensure that it does not contain impurities. Impurity particles, especially metal particles, can damage pipes and homogenizer valves and shorten the service life of the homogenizer. Check the pipeline to ensure that all components are installed correctly, sealed well, and all bolts are fully locked; check the air source (compressor or nitrogen gas tank, etc.) To ensure that it can provide the pressure required for work; check the cooling water, ensure that the cooling circulating water has been prepared in advance according to the process requirements, and connect the cooling water pipeline. Before loading the sample, completely empty the small amount of liquid remaining in the pipeline, and then introduce the sample into the sample tank, and circulate and pre-homogenize twice under air pressure. Then, according to the work requirements, the homogenization pressure is increased to start homogenization, and the pressure is reduced to zero after homogenization, and the feed liquid is discharged.

Fully automatic homogenizer manufacturers believe that after homogenization immediately rinse with warm water and 0.5M NaOH, rinse with water. Fully automatic homogenizer manufacturers believe that in this process, proper inflation and pressure for flushing, speed up the cycle speed, so that the pipeline flushing faster and more complete. Rinse 1-2 times with 50% alcohol to complete the entire cleaning process. After cleaning the pipeline, fill the sample tank and pipeline with 70% alcohol solution for the next use. If the entire pipe needs to be disinfected, after cleaning, the pipe should be disinfected with hot steam circulation for about 10 minutes.

  Automatic HomogenizerThe manufacturer believes that the homogeneous pressure should be determined according to the characteristics of the feed liquid, and the pressure should be gradually adjusted during the boosting process to avoid sudden changes in pressure. In the homogenization process, the homogenization pressure of the material is generally not more than 2000bar. In the case of overload operation, the equipment can be operated for a short time under an overpressure of 20%. After that, the control box circuit will automatically turn on the power-off protection function to stop the operation of the equipment, and the operation can be started again after 30 seconds. If the pressure cannot rise during the homogenization process, it means that the upper check valve is blocked, and the ball valve can be connected with a thin iron wire. During the homogenization process, attention should be paid to the state of the sample liquid flowing out of the pipe. If there is backflow or backspray, the lower check valve is blocked. Simply remove the check valve and clear the valve hole.